CBE Auburn Bay, Panorama, New Brighton, Tuscany, and Cooperfield New K to 4 Schools

The Calgary Board of Education has recently procured many new elementary schools to fill their need for facilities in the expanding areas of Calgary.

Location Calgary, AB Completion September, 2016

We have had the opportunity to assist them with design and tender construction services for school facilities that are aligned with their student learning strategies. These elementary schools were refined from previous P3 designs provided by Alberta Infrastructure with specific design features and details that meet the standards of the school board for facility design.

We have had the opportunity to partner with the CBE to complete a finished design for all of these schools that will provide them with infrastructure that is long-lasting, adaptable and aligned with their goals for their student population that continues to grow.

These schools house students in kindergarten through grade 6. The core school is provided with flexible spaces and movable walls that allow for gathering and engagement of large groups of students in project based learning environment.

Each school was delivered with modular classrooms attached and integrated into the plan.

Project Credits

Architect
  • Group2

Related Projects

Edwin Parr Exterior

Edwin Parr Composite High School

Athabasca, AB View Project

Fultonvale Elementary Junior High School

Sherwood Park, AB View Project

Don Campbell Elementary School

Red Deer, AB View Project
  • Facebook
  • Twitter
  • Instagram
  • LinkedIn
© 2019 Group2 Architecture Interior Design Ltd.